date

586 Vehicles Prepared for Winter Season in Tashkent

586 units of equipment prepared for winter in Tashkent
As part of preparations for the winter season in Tashkent, 586 units of special equipment designed to operate in low temperatures and emergency situations underwent planned inspections. This was reported by “Hududiy elektr tarmoqlari” JSC.

The inspection took place at the “Technopark” complex in the Yashnobod district. The event was attended by Minister of Energy Jorabek Mirzamahmudov and Tashkent Mayor Shavkat Umurzoqov.

During the inspection, the operational condition, full equipment, and round-the-clock readiness of the machinery were evaluated. Additionally, the procedure for distributing technical and emergency resources across the city was analyzed, and measures were taken to ensure coordinated services.

Ctrl
Enter
Found a mistake?
Select the phrase and press Ctrl+Enter
Information
Users of Меҳмон are not allowed to comment this publication.
News » Society » 586 Vehicles Prepared for Winter Season in Tashkent